A software company contracted its sister network technologies firm to upgrade its network and storage equipment. The sister firm charged the software company only for equipment and labor. What fraction of the total amount paid for the upgrade was the labor charge?
1. labor cost was $10,000 less than the total cost of the upgrade.
2. Without the labor charge, the total cost of the upgrade would have been only
as much.
1. labor cost was $10,000 less than the total cost of the upgrade.
2. Without the labor charge, the total cost of the upgrade would have been only
as much.