Loading [MathJax]/extensions/tex2jax.js

GMAT 考满分题库

- 数学PS -
Machines A, B, and C can either load nails into a bin or unload nails from that bin. Each machine works at a constant rate that is the same for loading and for unloading, although the individual machines may have different rates. Working together to load at their respective constant rates, machines A and B can load the bin in 6 minutes. Likewise, working together to load at their respective constant rates, machines B and C can load the bin in 9 minutes. How long will it take machine A to load the bin if machine C is simultaneously unloading the bin?
  • A12 minutes
  • B15 minutes
  • C18 minutes
  • D36 minutes
  • E54 minutes
显示答案
正确答案: C

讨论题目 或 发起提问

|

题目讨论

  • 按热度
  • 按顺序

最新提问

Get Microsoft Silverlight
查词 | 笔记